Load Banks In The Healthcare Sector
Testing solutions from the world’s leading load bank manufacturer
Load banks are used to test the effectiveness of standby systems in a variety of situations:

Key Factors
-
Running a generator on full load helps to avoid “wet stacking” where the engine’s performance is compromised by unburnt fuel, lubricating oil and condensation caused by a light load on the alternator and low engine temperature and exhaust gasses.
-
Using a load bank to simulate actual demand will prove whether the controls and switch panels work as expected under real conditions.
-
Regular “black start” testing will ensure that in the event of a power failure the standby system is capable of taking on the full load in 10 to 15 seconds of the generator starting.
-
Frequent operation of the automatic transfer switch (ATS), which regulates the sequence of large load application and shedding, for example lifts, HVAC motors and compressors, will facilitate its long term proper operation.
-
Regular discharge of the UPS using a DC load bank will ensure it can be maintained in its fully charged state for as long as possible.
-
Load testing of the total demand will ensure that any changes to the power profile of the building or process can be monitored – such as a change or upgrade in the A/C or heating, lifts or other machinery or a change in the generator itself (e.g. fuel, air flow, acoustics or change in the exhaust).


Crestchic exhibirá un nuevo banco de carga de 200 kW en Datacentre World London
Crestchic Loadbanks asistirá a Datacentre World London el 12 de marzo de 2025 para mostrar sus últimas innovaciones en bancos de carga y equipos de prueba. Un punto destacado clave en el evento de este año será el banco de carga del centro de datos apilable de 200 kW...

WHY USE A LOAD BANK?
Load banks are primarily used for testing electrical power output on diesel generators, gas turbines and UPS systems whilst carrying out commissioning and maintenance work.
The load banks are used for simulating real electrical loads enabling essential setup and commissioning which ensures that all electrical and control parameters are met prior to power generation/back up equipment being energized on line.