Crestchic, the leading loadbank manufacturer and supplier of load testing equipment, has recently sent a 5MVA test package to a water treatment plant in Cambridgeshire, to test its newly installed 11kV generators. Joann Price, UK Rentals Manager, said: “We sent out a 5MVA package to test the generators for a period of one week, but at the request of the main contractor, we will be increasing the capacity to 9.5MVA and extending the hire for a further 3 weeks.” The increase will require Crestchic to transport two further 6MVA loadbanks and two 5.8MVA step down Transformers.