Crestchic Loadbanks reach new heights with 22 Bishopsgate project

Crestchic Loadbanks reach new heights with 22 Bishopsgate project

Crestchic Loadbanks has supplied load testing solutions for one of London’s tallest and most high-tech tower blocks, heling to ensure that back up power systems will operate in the event of a power failure. At 288 metres high, 22 Bishopsgate is one of the tallest...
5G set to increase energy demands from Data Centres

5G set to increase energy demands from Data Centres

A new study carried out by Aachen University has found that 5G mobile communications will drastically increase the demand for energy at data centres. This increased demand. argues Paul Brickman from Crestchic load banks, puts additional pressure on data centre...