Jul 13, 2018 | News
A 10MVA load bank package operating at 11.5kV has been set up at Canary Wharf by Crestchic Loadbanks, the leading manufacturer and provider of load bank testing equipment. The load test equipment will remain on site while the regular planned maintenance programme is...
Jun 19, 2018 | News
Generators and UPS systems are the last line in the defence of total power loss should the main supply be interrupted. Savvy business owners utilise load bank packages from Crestchic, the leading load bank manufacturer, to test the reliability of the back-up supply. A...
Jun 5, 2018 | News
Crestchic, the world’s largest specialised loadbank manufacturer and rental company, has supplied the University of Chester with a nominally rated 300 kVA restive/reactive loadbank. This has been installed at its research and development facility at the Energy Centre...
May 29, 2018 | News
Crestchic Loadbanks, the acknowledged leader in load bank manufacture and supply, has provisioned 16x 300kW load banks for a load test at an Irish data centre. The on-going tests are part of a regular maintenance and commissioning programme by the client....
May 14, 2018 | News
Crestchic Loadbanks, the acknowledged global leader in load bank manufacture and supply, has provisioned a one-week hire of a 2.2MW 11kV package to test the emergency back-up systems at a Children’s Hospital in Scotland. Paul Brickman, Sales and Marketing...
Usamos cookies en nuestro sitio para proporcionar una variedad de servicios que nos ayudan a comprender mejor sus requisitos de nuestro sitio. Si desea obtener más información sobre qué cookies se almacenan exactamente, haga clic aquí para leer nuestra política de cookies. Si no desea dar su consentimiento para el uso de cookies, cierre este sitio web en su navegador. Puede eliminar manualmente las cookies almacenadas en su computadora utilizando el menú de herramientas de su navegador preferido.Bueno